Posts

Showing posts from September, 2021

Wind Power (Step By Step Procedure):- A Case Study

Image
      WIND DATA (STEP BY STEP PROCEDURE):- Image Source-Ritesh Raj Stone Column Image Source-Ritesh Raj Plum Concrete (Where required) PCC (M-15 Grade) Bottom Flange Erection (With level as per drawing) Reinforcement (12 mm to 32 mm as per drawing) RCC (M-45 Grade and M-60 Grade) In the M-60 Grade-GGBS also used (JSW Brand) Image Source-Ritesh Raj Used Curing Compound (Concure AB Clear) Top Flange Erection Bitumen Paint applied on all pedestal area Backfilling with layer wise compaction Grouting in top flange (With M-90 Grade BB-90, Brand-Fosroc) Total Flange Nos.=02  Total Bolts=80*2=160 Nos. Image Source-Ritesh Raj Used Admixture- (1.) ACC HP 6517 (2.) ACC HVF 7905(Corrosion) Image Source-Ritesh Raj 10 mm and 20 mm aggregate sources:- Anjar, Nakatrana Water Source-Khavda Sand Source-Mudhan, Kunariya, Ratariya GSB Sourvce-Raytariya, Anjar Required TDS of Water=Below 2000 Required PH of water=6.5 to 8.5 GGBS=Ground Granulated Blast Furnace Slag IDT=Inverter Duty Tran...

Bulk Density and Voids of Fine Aggregate

Image
 Bulk Density and Voids of Fine Aggregate Types :- (1.) Loose Weight (2.) Rodded Weight  Loose Weight  Image Source:-ScienceDirect.com Apparatus Required - (1) Weighing Balance (2) Temping Rod (3) Straight Edge (4) Fine Aggregate  (5) Observation Sheet (6) Cylindrical metal measure of 3 litres, 15 litres or 30 litres according to the size of coarses particle of aggregate. Image Source:-civilsir.com Recent Post:- Proctor Test for Compaction of Soil  Test Procedure :- (1) For size of particle 4.75 mm and under, cylindrical metal measure of capacity 3 litres is used. (2) For size of particle 4.75 mm to 40 mm cylindrical metal measure of capacity 15 litres is used. (3) For size of particle 40 mm and above, cylindrical metal measure of size 30 litres is used. (4) To start the experiment take the metal measure of 3 litres capacity. (5) Take the empty weight of metal measure=2.686 Kg Also Read:- Bulking of fine aggregate (6) Fill the metal cylinder with loose aggregate...

Popular posts from this blog

Wind Power (Step By Step Procedure):- A Case Study

Important Points SOP (Standard Operating Procedure) During the Inspection of RCC NP4 Pipes

"Sewer Network Analysis"