Wind Power (Step By Step Procedure):- A Case Study
WIND DATA (STEP BY STEP PROCEDURE):-
Image Source-Ritesh Raj |
Stone Column
Image Source-Ritesh Raj |
Plum Concrete (Where required)
PCC (M-15 Grade)
Bottom Flange Erection (With level as per drawing)
Reinforcement (12 mm to 32 mm as per drawing)
RCC (M-45 Grade and M-60 Grade)
In the M-60 Grade-GGBS also used (JSW Brand)
Image Source-Ritesh Raj |
Used Curing Compound (Concure AB Clear)
Top Flange Erection
Bitumen Paint applied on all pedestal area
Backfilling with layer wise compaction
Grouting in top flange (With M-90 Grade BB-90, Brand-Fosroc)
Total Flange Nos.=02
Total Bolts=80*2=160 Nos.
Image Source-Ritesh Raj |
Used Admixture-
(1.) ACC HP 6517
(2.) ACC HVF 7905(Corrosion)
Image Source-Ritesh Raj |
10 mm and 20 mm aggregate sources:- Anjar, Nakatrana
Water Source-Khavda
Sand Source-Mudhan, Kunariya, Ratariya
GSB Sourvce-Raytariya, Anjar
Required TDS of Water=Below 2000
Required PH of water=6.5 to 8.5
GGBS=Ground Granulated Blast Furnace Slag
IDT=Inverter Duty Transformer
PSS=Power System Stabilizer
CCR=Central Control Room
USS=Unitized Sub Station
IMIR-Incoming Material Inspection Report
HOTO-Hand Over Take Over
Total PCC Quantity=51.5 Cum (Which Plum Concrete it will extra quantity)
RCC-M-45 Grade-650 Cum
RCC-M-60 Grade-26 Cum
Grouting=4.164 Cum
1.DWC Pipe- - Inner Dia-50 mm, Length- 90 Mtr
2.Earthing Strip-(Size) -75 MM(W) *12 MM(T) *90 M (L)
3.Nito Bond- - Foscroc BB-92
4.Curing Compound - AB Clear
Comments
Post a Comment
If you have any suggestions and doubts please let me know.