Wind Power (Step By Step Procedure):- A Case Study

      WIND DATA (STEP BY STEP PROCEDURE):-


Image Source-Ritesh Raj


Stone Column

Image Source-Ritesh Raj


Plum Concrete (Where required)

PCC (M-15 Grade)

Bottom Flange Erection (With level as per drawing)

Reinforcement (12 mm to 32 mm as per drawing)

RCC (M-45 Grade and M-60 Grade)

In the M-60 Grade-GGBS also used (JSW Brand)

Image Source-Ritesh Raj


Used Curing Compound (Concure AB Clear)

Top Flange Erection

Bitumen Paint applied on all pedestal area

Backfilling with layer wise compaction

Grouting in top flange (With M-90 Grade BB-90, Brand-Fosroc)

Total Flange Nos.=02 

Total Bolts=80*2=160 Nos.

Image Source-Ritesh Raj

Used Admixture-

(1.) ACC HP 6517

(2.) ACC HVF 7905(Corrosion)

Image Source-Ritesh Raj


10 mm and 20 mm aggregate sources:- Anjar, Nakatrana

Water Source-Khavda

Sand Source-Mudhan, Kunariya, Ratariya

GSB Sourvce-Raytariya, Anjar

Required TDS of Water=Below 2000

Required PH of water=6.5 to 8.5


GGBS=Ground Granulated Blast Furnace Slag

IDT=Inverter Duty Transformer

PSS=Power System Stabilizer

CCR=Central Control Room

USS=Unitized Sub Station

IMIR-Incoming Material Inspection Report

HOTO-Hand Over Take Over

Total PCC Quantity=51.5 Cum (Which Plum Concrete it will extra quantity)


RCC-M-45 Grade-650 Cum

RCC-M-60 Grade-26 Cum

Grouting=4.164 Cum


1.DWC Pipe- - Inner Dia-50 mm, Length- 90 Mtr

2.Earthing Strip-(Size) -75 MM(W) *12 MM(T) *90 M (L)

3.Nito Bond- - Foscroc BB-92

4.Curing Compound - AB Clear



     Thanks for visiting this site.


Written By-
Ritessh Rajh

Email Id-rajritesh.motiharirr@gmail.com




Comments

Popular posts from this blog

Methodology for Trenchless Piping by Jack Pushing Method

Final Setting Time of Cement

Important Points SOP (Standard Operating Procedure) During the Inspection of RCC NP4 Pipes