Wind Power (Step By Step Procedure):- A Case Study

Image
      WIND DATA (STEP BY STEP PROCEDURE):- Image Source-Ritesh Raj Stone Column Image Source-Ritesh Raj Plum Concrete (Where required) PCC (M-15 Grade) Bottom Flange Erection (With level as per drawing) Reinforcement (12 mm to 32 mm as per drawing) RCC (M-45 Grade and M-60 Grade) In the M-60 Grade-GGBS also used (JSW Brand) Image Source-Ritesh Raj Used Curing Compound (Concure AB Clear) Top Flange Erection Bitumen Paint applied on all pedestal area Backfilling with layer wise compaction Grouting in top flange (With M-90 Grade BB-90, Brand-Fosroc) Total Flange Nos.=02  Total Bolts=80*2=160 Nos. Image Source-Ritesh Raj Used Admixture- (1.) ACC HP 6517 (2.) ACC HVF 7905(Corrosion) Image Source-Ritesh Raj 10 mm and 20 mm aggregate sources:- Anjar, Nakatrana Water Source-Khavda Sand Source-Mudhan, Kunariya, Ratariya GSB Sourvce-Raytariya, Anjar Required TDS of Water=Below 2000 Required PH of water=6.5 to 8.5 GGBS=Ground Granulated Blast Furnace Slag IDT=Inverter Duty Tran...

Important Points SOP (Standard Operating Procedure) During the Inspection of RCC NP4 Pipes

Image
Important Points SOP (Standard Operating Procedure) During the Inspection of RCC NP4 Pipes: -    Image-Hydro Test (Photo Credit: Ritesh Raj) (1.) Firstly, approved QAP will be checked.  (2.) ID marks should be marked on the inner and outer sides of pipes.  Image-ID Mark (Photo Credit: Ritesh Raj)  (3.) To check the inner and outer diameter of pipes.   (4.) Smooth finishing and before dispatch of RCC pipes cement slurry or grouting where required.   (5.) Load test is required for RCC pipes as per IS codes. It is different for each dia, of RCC pipes.  Image-Plate Load Test (Photo Credit: Ritesh Raj)   (6.) Concrete mix design checked and in which cement content, cement brand, and water-cement ratio should be checked.  (7.) The straightness test to be checked of RCC pipes through the straightness rods to collinear visible.   (8.) As per requirement 2% of hydro tests are to be checked as IS:458 of the total...

Popular posts from this blog

Wind Power (Step By Step Procedure):- A Case Study

Important Points SOP (Standard Operating Procedure) During the Inspection of RCC NP4 Pipes

"Sewer Network Analysis"