Important Points SOP (Standard Operating Procedure) During the Inspection of RCC NP4 Pipes: -    Image-Hydro Test (Photo Credit: Ritesh Raj) (1.) Firstly, approved QAP will be checked.  (2.) ID marks should be marked on the inner and outer sides of pipes.  Image-ID Mark (Photo Credit: Ritesh Raj)  (3.) To check the inner and outer diameter of pipes.   (4.) Smooth finishing and before dispatch of RCC pipes cement slurry or grouting where required.   (5.) Load test is required for RCC pipes as per IS codes. It is different for each dia, of RCC pipes.  Image-Plate Load Test (Photo Credit: Ritesh Raj)   (6.) Concrete mix design checked and in which cement content, cement brand, and water-cement ratio should be checked.  (7.) The straightness test to be checked of RCC pipes through the straightness rods to collinear visible.   (8.) As per requirement 2% of hydro tests are to be checked as IS:458 of the total ordered quantity.  Image-Hydro Test (Pressure Release) (Photo Credit: Ritesh Raj)  

Civil Engineering Technical Terms




        Civil Engineering Technical Terms

From this page, you will know civil engineering technical terms better.
                       
Image Source:Pexels.com

FAR- Floor Area Ratio

DPC-Damp Proof Course

B.M-Bench mark

BOQ-Bill of Quantities

C. I. Pipe-Cast iron pipe

C. I. Sheet-Corrugated Iron sheet

CC-Cement concrete

CJ-Construction Joint

CRW-Concrete Retaining Wall

DPR-Daily Progress Report

DL-Development Length

EMP-Environmental Management Plan

EGL-Existing Ground Level

FL-Floor Level

GL-Ground Level

HFL-Highest Flood Level

LWC-Light Weight Concrete

MB-Measurement Book

MFL-Maximum Flood Level

MPR-Monthly Progress Report

Image Source:Pexels.com

MRC-Material Receipt Challan

NBC-National Building Code

OGL-Original Ground Level 

PC-Precast Concrete

PPE-Personal Protective Equipment

PVC-Polyvinyl Chloride

QMP-Quarterly Management Plan

R.B.W.-Reinforced brick work

TBM-Temporary Bench Mark

VP-Vertical plane

HP-Horizontal Plane

WO-Work Order
          
Image Source:Pexels.com

Quality Related:-

FM-Fineness Modulus

C.T.M.-Compressive Testing Machine

QA/QC-Quality Assurance and Quality Control

TPI-Third Party Inspection

TM-Transit Mixer

PQP-Project Quality Plan

QMP-Quality Management Plan

FQP-Field Quality Plan

QAP-Quality Assurance Plan

QCP-Quality Management Plan

SOP-Standard Operating Procedure

ITP-Inspection and Test Plan

CM-Construcrtion Management

QMS-Quality Management System

TQM-Total Quality Management


Image Source:Pexels.com

Posts Related:-

AE-Assistant Engineer

CE-Chief Engineer

JE-Junior Engineer

PM-Project Manager

PWD-Public Works Department


PD-Project Director

DPD-Deputy Project Director

APD-Assistant Project Director

AM-Assistant Manager

DPM-Deputy Project Manager

GM-General Manager

DGM-Deputy General Manager

AGM-Assistant General Manager

AVP-Assistant Vice President

VP-Vice President

CE-Chief Engineer

SDO-Sub Divisional Officer

Image Source:Pexels.com


Institute Related:-

ISI-Indian Standard Institute

ASTM-American Society for Testing & Materials

BIS-Bureau of Indian Standards

ISO-International Organization of Standardization

SI Units-International System of Units

NSC-National Safety Council

WSC-World Safety Council

Image Source:Pexels.com


Safety Related:-

HSE- Health Safety and Environment

OHSAS- Occupational Health and Safety Assessment Series

HIRA - Hazard Identification and Risk Analysis

IOSH-Institute of Occupational Safety and Health

NIBOSH-National Examination Board in Occupational Safety and Health

JSA-Job Safety Analysis

JHA-Job Hazard Analysis

LTA-Loss Time Accident

LTI-Loss Time Injury

LTIF-Loss Time Injury Frequency

PPE-Personal Protective Equipment

SOP-Safe Operating Procedure

SWL-Safe Working Load

LOTO-Log out Tag Out

FAC-First Aid Case    
Image Source:Pexels.com

NFPA- National Fire Protection Association

PTW-Permit to Work

PEL-Permissible Exposure Limit

CPR- Cardio Pulmonary Resuscitation

SCBA- Self Content Breathing Apparatus

SCUBA-Self Content Under water Breathing Apparatus

PFAS-Personal Fall Arrester System

FFE-Fire Fighting Equipment

SWP-Safe Work Procedure

LEL-Lower Exposure Limit

ULE-Upper Exposure Limit

PPM-Parts Per Million

EMS-Emergency Management System

MSDS-Material Safety Data Sheet

ERP-Emergency Rescue Plan

TBT-Tool Box Talk

UA-Unsafe Act

UC-Unsafe Condition





     
Has this blog been helpful to you? If yes, please mention in the comment box.



Thanks for visiting this site.


Written By-
Ritesh Raj
Email Id-rajritesh.motiharirr@gmail.

Comments

Popular posts from this blog

"Sewer Network Analysis"

Important Points SOP (Standard Operating Procedure) During the Inspection of RCC NP4 Pipes

"Solar Power System"