Important Points SOP (Standard Operating Procedure) During the Inspection of RCC NP4 Pipes

Image
Important Points SOP (Standard Operating Procedure) During the Inspection of RCC NP4 Pipes: -    Image-Hydro Test (Photo Credit: Ritesh Raj) (1.) Firstly, approved QAP will be checked.  (2.) ID marks should be marked on the inner and outer sides of pipes.  Image-ID Mark (Photo Credit: Ritesh Raj)  (3.) To check the inner and outer diameter of pipes.   (4.) Smooth finishing and before dispatch of RCC pipes cement slurry or grouting where required.   (5.) Load test is required for RCC pipes as per IS codes. It is different for each dia, of RCC pipes.  Image-Plate Load Test (Photo Credit: Ritesh Raj)   (6.) Concrete mix design checked and in which cement content, cement brand, and water-cement ratio should be checked.  (7.) The straightness test to be checked of RCC pipes through the straightness rods to collinear visible.   (8.) As per requirement 2% of hydro tests are to be checked as IS:458 of the total ordered quantity.  Image-Hydro Test (Pressure Release) (Photo Credit: Ritesh Raj)  

List of Registers And Formats





Image Source:Pexels.com



 I am presenting here some lists of registers, formats and tests details which is conducted in the initial stages of any construction sites of the respective projects and it will continue further.Some tests will also add in it in future as per client requirement.

Different project have different format , but their content  will never changes.Test frequency will depends upon FQP (Field Quality Plan), IS Code-4926 and MORTH guidelines.  


With the help of following mentioned content, you can remove difficulties which will comes initial stages of the starting of the project:-







LIST OF REGISTERS (FOR QUALITY PURPOSE)
Sl. No.
Name Of Register
1
Cube Test Register
2
Slump Cone Test Register


Also Read:List of Important IS Codes
                     
LIST OF REGISTERS (OTHER REGISTERS)
Sl. No.
Name of Register
1
Site Order Book
2
Hinderence Register
3
Weekly Meeting Register
4
Daily Monitoring Register
5
Grievance Register
6
Excavation Details Register
7
Disposal Of Soil Register
8
Stock Register

    
LIST OF FORMATS (FOR QUALITY PURPOSE)
Sl. No.
Name of Formats
1
Test for bulking of sand
2
Test Certificate for sand (Gradation/ Sieve Analysis)
3
Water certificate for construction water
4
Test certificate for Bricks
5
Aggregate impact  value test
6
Flakiness & Elongation test
7
Gradation/Sieve analysis of 20 mm
8
Gradation/Sieve analysis of 10 mm
9
Moisture content test
10
Water absorption test /Specific Gravity Test
11
Backfilling (Soil compaction test)
12
MDD/OMC Test
13
GSB Gradation Test



LIST OF TESTS (CONDUCTED BY THIRD PARTY)
1
Drinking Water Test
2
Construction Water Test
3
Ambient Air Test
4
Ambient Noise Test
5
 Soil Test
  





Image Source:Pexels.com


Has this blog been helpful to you? If yes, please mention in the comment box.

Thanks for visiting this site.



Written By- 
Ritesh Raj
Email Id-rajritesh.motiharirr@gmail.com






Image Source:Pexels.com
      





Comments

Popular posts from this blog

"Sewer Network Analysis"

Important Points SOP (Standard Operating Procedure) During the Inspection of RCC NP4 Pipes

Methodology for Trenchless Piping by Jack Pushing Method