Important Points SOP (Standard Operating Procedure) During the Inspection of RCC NP4 Pipes

Image
Important Points SOP (Standard Operating Procedure) During the Inspection of RCC NP4 Pipes: -    Image-Hydro Test (Photo Credit: Ritesh Raj) (1.) Firstly, approved QAP will be checked.  (2.) ID marks should be marked on the inner and outer sides of pipes.  Image-ID Mark (Photo Credit: Ritesh Raj)  (3.) To check the inner and outer diameter of pipes.   (4.) Smooth finishing and before dispatch of RCC pipes cement slurry or grouting where required.   (5.) Load test is required for RCC pipes as per IS codes. It is different for each dia, of RCC pipes.  Image-Plate Load Test (Photo Credit: Ritesh Raj)   (6.) Concrete mix design checked and in which cement content, cement brand, and water-cement ratio should be checked.  (7.) The straightness test to be checked of RCC pipes through the straightness rods to collinear visible.   (8.) As per requirement 2% of hydro tests are to be checked as IS:458 of the total ordered quantity.  Image-Hydro Test (Pressure Release) (Photo Credit: Ritesh Raj)  

Important One Liner Question With Answers, Part 4

Image
I am presenting here most important (mixed topic) one liner questions with their answer from civil engineering, in which most are asked in various competitive examinations. Please go through it.  Image Source:-Pexels.com       (1.)   The most commonly used base for timber painting- White Lead      (2.)   The most used fire resistant paint- Asbestos Paint      (3.)   For a good building stone, its specific gravity should be greater than- 2.7      (4.)   The real image of an objects formed by the objective must lie- in the plane of cross hairs     (5.)   Which method is used for the preparation of a contour plan for a route survey? - Method of cross hairs    (6.)   Which method is used for the preparation of a contour plan for a route survey- Method of cross profile        (7.)   If a tachometer is fitted with an analectic lens, then- the multiplying constant is 100, the additive constant is zero Image Source:-Pexels.com      (8.)   In wh

Thermal Power Plant Description

Image
Power is essential for everyone.It is used for electricity generation, handling small or large based industry, commercial purposes, industrial purposes and institutional purposes.The power generation through coal and water is known as thermal power plant.In present scenario, coal based thermal power plant play a vital role in India and world wide. Some details are following:- Main Part of Thermal Power Plant- (1.)            Wagon tippler/Track Hopper (2.)            Crusher House (3.)            Conveyor Belt (4.)            Transfer Tower (5.)            CHP (Coal Handling Plant) (6.)            Coal Mill (7.)            Boiler (8.)            FGD (Flue Gas Desulfurization) (9.)            Chimney Working Procedure of thermal power plant:- Canal or river         ⇣                   ⇣          ⇣ Raw Water Intake Pump House (RWIPH)          ⇣          ⇣          ⇣ Reservoir           ⇣             ⇣

Popular posts from this blog

"Sewer Network Analysis"

Important Points SOP (Standard Operating Procedure) During the Inspection of RCC NP4 Pipes

Methodology for Trenchless Piping by Jack Pushing Method